Skip to content

Parkland, Broward County

Commercial painting in Parkland

Parkland is the Broward city that says outright that painting needs no permit. Its Building Division FAQ states that a permit is not required for interior or exterior painting. The same answer adds a limit: work that is exempt from permit must still comply with the Code.

The FAQ wording is: "A permit is not required for interior or exterior painting, for repairs of leaks, unstopping of sewers or waste pipes," followed by "All work where exempt from permit shall still be required to comply with the Code." No permit does not mean no rules. Surface repairs that go beyond paint, such as stucco or structural work, are a separate question for the Building Division.

Without a city paint permit, the color decision rests with the owner and any private agreements that bind the property. Those agreements are worth reading before a color is picked, because the city's exemption does not cancel them. A recorded declaration or lease clause can still require a landlord's or association's sign-off on exterior colors.

Romco plans a Parkland repaint without a permit step, but not without a check. We confirm the scope is paint and coatings only, flag any repair that might need a permit, and then phase the work around tenants and parking. If cracked stucco or damaged substrate turns up during prep, that work is quoted and raised separately before it starts.

Permits and approvals in Parkland

City of Parkland Building Division

A permit is not required for interior or exterior painting. Work that is exempt from permit must still comply with the Code.

Official source

General information, not legal advice. Whether a painting job needs a permit depends on the work; we confirm it with the city before work starts. Broward painting rules

What we quote in Parkland

Commercial painting for any building, including

How a job runs

Six steps, in this order

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. The order below is the same for one suite and for a whole tower.

  1. Send the address and the surfaces

    Call, or use the quote form with photos or drawings. Tell us what gets painted, who is inside, and any deadline.

  2. We walk the building

    We look at the surfaces and their condition, the access each elevation needs, and what has to stay protected.

  3. Written scope and quote

    The quote names the prep, the coating system, the access method, the phasing and what depends on approvals.

  4. Approvals and permits

    Color or board approval, any city permit the work triggers, and access or security clearances are settled first.

  5. Prep and coating

    Washing, repairs, primer and finish coats follow the agreed sequence, with areas below protected while work is overhead.

  6. Punch list and turnover

    We walk the finished work with you, close the punch list, and hand over the coating record for the building file.

Questions

Commercial painting in Parkland

Do I need a permit to paint a commercial building in Parkland?

No. Parkland's Building Division FAQ says a permit is not required for interior or exterior painting, though exempt work must still comply with the Code.

What does commercial painting cost?

Every job is quoted from a walk of the building, or from photos and drawings when they show enough. The number depends on the surfaces and their condition, how much prep and repair they need, the coating system, the access each elevation needs, whether people stay inside during the work, and what approvals come first. We do not publish rates, because two buildings that look alike rarely are.

What about lead paint on an older building?

Paint applied before 1978 can contain lead. Federal EPA rules on renovation, repair and painting cover work that disturbs paint in pre-1978 housing and in child-occupied facilities, and where they apply the work is done by a certified firm with lead-safe practices. We check the building's age and use before the scope is written.

How long does a commercial repaint take?

A schedule comes after the walk-through, not before it. The schedule depends on the size and condition of the surfaces, the repairs found once washing is done, the weather, the access method, any board or color approval, and the hours the building allows us to work. Once those are known, you get a sequence with the dependencies named.

Other Broward cities: Fort Lauderdale · Hollywood · Pompano Beach · Coral Springs · Pembroke Pines · Plantation · Davie · Sunrise · Deerfield Beach · Miramar · Weston · Tamarac · Margate · Coconut Creek · Lauderhill · Oakland Park · Wilton Manors · Lauderdale-By-The-Sea · Hallandale Beach · Dania Beach · Lighthouse Point

Any building, any size, anywhere in Broward County

Send the building and the surfaces. We will scope and quote the work.

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. One tenant suite or a whole tower: every job gets a written scope and a quote.

Call (954) 947-4881Request a quote