Coconut Creek, Broward County

Commercial painting in Coconut Creek

Coconut Creek has handled commercial color changes through the approved site plan file. In a 2012 memo, the Development Review Committee accepted paint color changes for a Coconut Creek Parkway building into that file and found no additional review was needed. Because the example is dated, the current process should be confirmed first.

The memo's language shows the logic: the committee accepted the change into the approved site plan file because of "the nature of the request and the negligible impacts associated with the change." It also stated that the approval was limited and did not excuse the applicant from the rest of the approved site plan and the building and engineering permits.

That tells a commercial owner two things. Colors on a site plan are part of what the city approved, so changing them is a change to an approved plan. And a small, low-impact change can be handled without a full re-review, but only after the city says so in writing.

We did not find a current city page describing the commercial repaint process, so Romco starts a Coconut Creek job by asking the Building Department and Development Services what they need today. With that answer in hand, the job plans like any occupied-site repaint: phase by elevation, keep entrances open, and match the record.

Sources: City of Coconut Creek, memo on paint color changes, 3840 Coconut Creek Parkway (2012)

Permits and approvals in Coconut Creek

City of Coconut Creek Building Department and Development Services

No current published commercial paint rule was found. City staff confirm whether a color change needs review against the approved site plan.

Official source

General information, not legal advice. Whether a painting job needs a permit depends on the work; we confirm it with the city before work starts. Broward painting rules

What we quote in Coconut Creek

Commercial painting for any building, including

How a job runs

Six steps, in this order

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. The order below is the same for one suite and for a whole tower.

  1. Send the address and the surfaces

    Call, or use the quote form with photos or drawings. Tell us what gets painted, who is inside, and any deadline.

  2. We walk the building

    We look at the surfaces and their condition, the access each elevation needs, and what has to stay protected.

  3. Written scope and quote

    The quote names the prep, the coating system, the access method, the phasing and what depends on approvals.

  4. Approvals and permits

    Color or board approval, any city permit the work triggers, and access or security clearances are settled first.

  5. Prep and coating

    Washing, repairs, primer and finish coats follow the agreed sequence, with areas below protected while work is overhead.

  6. Punch list and turnover

    We walk the finished work with you, close the punch list, and hand over the coating record for the building file.

Questions

Commercial painting in Coconut Creek

Has Coconut Creek reviewed commercial paint color changes before?

Yes. A 2012 city memo shows the Development Review Committee accepting paint color changes for a Coconut Creek Parkway building into the approved site plan file without additional review. Confirm today's process with the city.

What does commercial painting cost?

Every job is quoted from a walk of the building, or from photos and drawings when they show enough. The number depends on the surfaces and their condition, how much prep and repair they need, the coating system, the access each elevation needs, whether people stay inside during the work, and what approvals come first. We do not publish rates, because two buildings that look alike rarely are.

What about lead paint on an older building?

Paint applied before 1978 can contain lead. Federal EPA rules on renovation, repair and painting cover work that disturbs paint in pre-1978 housing and in child-occupied facilities, and where they apply the work is done by a certified firm with lead-safe practices. We check the building's age and use before the scope is written.

How long does a commercial repaint take?

A schedule comes after the walk-through, not before it. The schedule depends on the size and condition of the surfaces, the repairs found once washing is done, the weather, the access method, any board or color approval, and the hours the building allows us to work. Once those are known, you get a sequence with the dependencies named.

Other Broward cities: Fort Lauderdale · Hollywood · Pompano Beach · Coral Springs · Pembroke Pines · Plantation · Davie · Sunrise · Deerfield Beach · Miramar · Weston · Tamarac · Margate · Lauderhill · Oakland Park · Wilton Manors · Lauderdale-By-The-Sea · Hallandale Beach · Dania Beach · Lighthouse Point · Parkland

Any building, any size, anywhere in Broward County

Send the building and the surfaces. We will scope and quote the work.