Miramar, Broward County

Commercial painting in Miramar

Miramar runs commercial repaints through a Repaint Permit with a real deadline. Once the permit issues, the scope must be completed within 180 days, and the job ends with a Final Zoning Inspection. Before that, the city wants each building's color palette shown on a site plan and on renderings.

The Repaint Permit Application, revised September 2025, asks for a site plan, survey or aerial showing the proposed color palette assigned to each building, plus photographs or renderings of each building with the palette applied using a paint color visualizer. A physical Color Palette Detail Sheet with chips must reach Planning and Zoning within one week of the online submittal. The sheet splits colors into base walls and columns, fascia, and accent or trim.

Much of the city's commercial square footage sits in the Miramar Park of Commerce, which Florida Trend described in 2019 as a logistics and commerce park of five million square feet, home to some 180 employers. Multi-building parks like that are where the per-building palette requirement adds real work to the submittal.

The 180-day clock shapes how Romco plans a Miramar job. Mobilizing before labor, lifts and materials are ready wastes permit time, so we hold the application until the schedule is firm, deliver the chips inside the week, and phase a multi-building park so every building reaches its zoning inspection inside the window.

Sources: Florida Trend, Miramar: the crossroads (2019)

Permits and approvals in Miramar

City of Miramar, Building, Planning and Zoning Department

Commercial repaints need a Repaint Permit with a color palette per building and a chip sheet. Work must finish within 180 days of issue and close with a Final Zoning Inspection.

Official source

General information, not legal advice. Whether a painting job needs a permit depends on the work; we confirm it with the city before work starts. Broward painting rules

What we quote in Miramar

Commercial painting for any building, including

How a job runs

Six steps, in this order

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. The order below is the same for one suite and for a whole tower.

  1. Send the address and the surfaces

    Call, or use the quote form with photos or drawings. Tell us what gets painted, who is inside, and any deadline.

  2. We walk the building

    We look at the surfaces and their condition, the access each elevation needs, and what has to stay protected.

  3. Written scope and quote

    The quote names the prep, the coating system, the access method, the phasing and what depends on approvals.

  4. Approvals and permits

    Color or board approval, any city permit the work triggers, and access or security clearances are settled first.

  5. Prep and coating

    Washing, repairs, primer and finish coats follow the agreed sequence, with areas below protected while work is overhead.

  6. Punch list and turnover

    We walk the finished work with you, close the punch list, and hand over the coating record for the building file.

Questions

Commercial painting in Miramar

How long do I have to finish a commercial repaint in Miramar?

The Repaint Permit Application says the scope of work must be completed within 180 days of the issued permit date, after which the applicant must schedule a Final Zoning Inspection.

What does commercial painting cost?

Every job is quoted from a walk of the building, or from photos and drawings when they show enough. The number depends on the surfaces and their condition, how much prep and repair they need, the coating system, the access each elevation needs, whether people stay inside during the work, and what approvals come first. We do not publish rates, because two buildings that look alike rarely are.

What about lead paint on an older building?

Paint applied before 1978 can contain lead. Federal EPA rules on renovation, repair and painting cover work that disturbs paint in pre-1978 housing and in child-occupied facilities, and where they apply the work is done by a certified firm with lead-safe practices. We check the building's age and use before the scope is written.

How long does a commercial repaint take?

A schedule comes after the walk-through, not before it. The schedule depends on the size and condition of the surfaces, the repairs found once washing is done, the weather, the access method, any board or color approval, and the hours the building allows us to work. Once those are known, you get a sequence with the dependencies named.

Other Broward cities: Fort Lauderdale · Hollywood · Pompano Beach · Coral Springs · Pembroke Pines · Plantation · Davie · Sunrise · Deerfield Beach · Weston · Tamarac · Margate · Coconut Creek · Lauderhill · Oakland Park · Wilton Manors · Lauderdale-By-The-Sea · Hallandale Beach · Dania Beach · Lighthouse Point · Parkland

Any building, any size, anywhere in Broward County

Send the building and the surfaces. We will scope and quote the work.

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. One tenant suite or a whole tower: every job gets a written scope and a quote.

Call (954) 947-4881Request a quote